A-102

Approach

Design that does the work before the machines do.

Every project starts with three drawings: a sun path, a wind rose and a map of materials within a day's drive. Here is what we do with them.

Hand-trowelled lime plaster in raking light
Three drawings before anything else

A-102.1 — Method

We start every project with three drawings: a sun path, a wind rose and a materials map.

A brick bottle kiln joined by a low glass and timber pavilion

A-102.2 — Principles

How we design

Three principles, each tested on real buildings and measured after people move in.

01 — Light

Sun path first

Sun path over the year at 38.72° north, with the shadow of a small buildingNSEW
Season

ALT — · AZ —

FIG. — Sun path, 38.72° N

Openings with a job

Every window is drawn with a purpose: a view, a breeze, a patch of winter sun on the floor. If we can't name its job, it doesn't get built.

Glare is a design failure

Deep reveals, overhangs and louvres keep direct sun off screens and faces in summer, and let it deep into rooms in winter.

Dappled light through a timber lattice roof
Orchard Pavilion — the lattice at noon

02 — Air

Buildings that breathe

FIG. — Cross-ventilation and stack effect

Cross-ventilation

Rooms no more than two windows deep, with openings on opposite sides.

Stack effect

Tall volumes and high vents draw warm air up and out.

Shaded courtyards

A pool of cool air the house can breathe from.

Patterned shadows from a perforated brick screen on a veranda
Stilt House — shade from a brick screen

03 — Material

Materials that age well

Hover a layer to read its specification

  1. 01Rammed-earth plinth500 mm · soil from the site, stabilised with lime
  2. 02Timber floor cassette300 mm · spruce joists filled with wood fibre
  3. 03CLT walls120 mm · cross-laminated spruce, left exposed inside
  4. 04Wood-fibre insulation200 mm · breathable, made from sawmill offcuts
  5. 05Lime render + timber cladding30 mm · repairable, re-oilable, no plastics
  6. 06Oak windowsTriple glazed in oiled oak frames
  7. 07Green roof350 mm · sedum over a timber deck; slows rainwater
FIG. — Exploded axonometric, wall-to-roof build-up

Local first

We map materials within 150 km before we specify anything.

Repairable over replaceable

Screwed, not glued. Lime, not cement. Timber you can re-oil.

Honest ageing

Surfaces that look better at twenty years than at handover.

Rammed-earth strata in raking light
Hillside Winery — the vineyard's own soil

A-102.3 — Makers

Makers we trust

We work with structural engineers, landscape designers and craftspeople.

A-102.4 — In practice

Where you can see it

Curious how this applies to your site?

Send us an address and a few lines about what you need. We'll sketch the sun and the wind for you.

Start a conversation

A-600 — Careers

Draw with us

We're a small studio that gives people real responsibility early — and time to do things properly.

Architects, interior designers and model-makers: see what's open, or write to us anyway.

Open roles